Location

Jiangsu TMS Concrete Admixture Co. Ltd., China

Project goal

To reduce water consumption.

Project

Gaining cooling water from the Jinghang Canal, China

Activities

  • Reconstruction of the underground water pool beside the Jinghang Canal , located in the west side of TMS plant
  • Build-up of the water treatment tower, including tank, pumps and related pipes with reactors.
  • Installation of the iron fence for safety.
  • Pilot operation
  • Implementation of the management rules and regulations.
  • Maintenance of regular operation of water tower.

Results

  • The water consumption (excluding water in products) per ton produced in 2014 decreased by 40% compared to 2013, from 2.4 m3 per ton to 1.4 m3 per ton.