Rizon Jet Hangar at Biggin Hill Airport, Kent UK
yes
Rizon Jet Hangar at Biggin Hill Airport, Kent UK

A new multi million pound hangar with 13,000 sq m at Biggin Hill Airport, Biggin Hill, Bromley.

Dubai International Airport, UAE
yes
Dubai International Airport, UAE

Besides the classical fire protection coating, in this terminal there were further Sika products used.

Air: Hangars

Search results  in 153.7 ms
No Download/Name Doctype Lang Format Size
1 Abu Dhabi International Airport References Construction (Sika at Work) English pdf 0.60 MB
Abu Dhabi International Airport

Short description

Roof Refurbishment for the VIP Lounge and the
Main Entrance

Date: 17/04/2012
saw_Abu Dhabi International Airport.pdf
Download pdf

2 Detailing with sikalastic liquid membrane References Construction (Sika at Work) English pdf 1.08 MB
Detailing with sikalastic liquid membrane

Short description

Detailing with Sikalastic®-621 on single ply membranes

Date: 15/05/2014
791_saw_Detailing with Sikalastic.pdf
Download pdf

3 Dubai International Airport, UAE References Construction (Sika at Work) English pdf 0.30 MB
Dubai International Airport, UAE

Short description

Steel Structure Protection for 7 Emirates Hangars

Date: 12/08/2015
No 40_SAW_Dubai Airport.pdf
Download pdf

4 Enfidha Airport References Construction (Sika at Work) English pdf 1.01 MB
Enfidha Airport

Short description

New International Airport, Tunisia

Date: 12/04/2012
04_10_saw_enfidha_airport_tunisia.pdf
Download pdf

5 Flooring for Eurocopter Chile S.A. Hangars, Tobalaba Airdrome, Santiago, Chile References Construction (Sika at Work) English pdf 0.39 MB
Flooring for Eurocopter Chile S.A. Hangars, Tobalaba Airdrome, Santiago, Chile

Short description

Eurocopter Chile S.A. is a company that provides a complete support and tailor-made services related to helicopters (sales, rent, maintenance, trainings and others).
Due to Corporate policies and owner’s requirements, the facilities and specially the Hangar’s floors must have high durability and aesthetic finishing.
In this case it was necessary to apply protective coating to the concrete floor slabs of Eurocopter Chile S.A. Hangars, located in Tobalaba Airdrome, Santiago, Chile.

Date: 17/02/2016
hangars-tobalaba-airdrome-santiago-chile.pdf
Download pdf

6 Refurbishment of Shed Roofs References Construction (Sika at Work) English pdf 0.73 MB
Refurbishment of Shed Roofs

Date: 25/11/2014
No02.13_saw_Refurbishment of Shed Roofs_A3.pdf
Download pdf

7 Rizon Jet Hangar at Biggin Hill Airport, Kent UK References Construction (Sika at Work) English pdf 0.49 MB
Rizon Jet Hangar at Biggin Hill Airport, Kent UK

Short description

This is a new multi million pound hangar with 13,000 sq m at Biggin Hill Airport, Biggin Hill, Bromley. The construction was completed in August 2010. Sika has provided high level of technical back-up and support, and had access to a wide variety of solutions.

Date: 12/12/2013
rizon-jet-hangar-biggin-hill-airport-kent-uk.pdf
Download pdf

8 Sika SolarMount-1 Field experiences References Construction (Sika at Work) English pdf 0.73 MB
Sika SolarMount-1 Field experiences

Short description

Sika SolarMount-1 Field experiences

Date: 14/04/2014
740_saw_Sika SolarMount-1_Field Experiences.pdf
Download pdf