
The Airport Link and busway project involves total 15 km of tunnelling including the toll road (5.7 km of twin tunnels) etc.

The Thiess John Holland Joint Venture has been appointed as the principal contractor to deliver the $4.8billion Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade – Australia’s largest road infrastructure project which is scheduled for completion in 2012. The project is contracted as a PPP project (Private Public Partnership) including design, built, operation and maintenance service, under a fixed-price contract for an initial five-year period following the tunnel opening.


The bypass Lungern is a roundabout 4.25 km long road project of the Canton Obwalden in the Centre of Switzerland.

The bypass Lungern is a roundabout 4.25 km long road project of the Canton Obwalden in the Centre of Switzerland. Main building is the 3’570 m long, two-lane traffic tunnel. An essential element to ensure the national safety regulation is the parallel emergency tunnel, which is subsequently incorporated into the project, linked with the main tunnel by cross passages of every 250 m. Additional niches for services, SOS and fire hydrants are also elements of the main tunnel.

Automotive: Road Tunnels
No | Download/Name | Doctype | Lang | Format | Size | |
---|---|---|---|---|---|---|
1 | Brisbane Airport Link-Waterproofing with SikaplanBrisbane Airport Link, Waterproofing with SikaplanBrisbane Airport Link - Waterproofing with Sikaplan® | References Construction (Sika at Work) | English | 0.64 MB | ||
![]() |
Short description
The Airport Link and busway project involves total 15 km of tunnelling
Date: 21/02/2013
No4_2011_saw_Brisbane.pdf
Download pdf
|
|||||
2 | Bypass Lungern, Switzerland | References Construction (Sika at Work) | English | 0.95 MB | ||
![]() |
Short descriptionBypass Lungern, Switzerland
Date: 12/04/2012
27_saw_bypass_lungern_switzerland_low.pdf
Download pdf
|
|||||
3 | Coatzacoalcos Tunnel, Mexico | References Construction (Sika at Work) | English | 1.00 MB | ||
![]() |
Short descriptionInfrastructure Projects.
Date: 12/04/2012
04_saw_coatzacoalcos_tunnel.pdf
Download pdf
|
|||||
4 | Klimkovice Highway Tunnel | References Construction (Sika at Work) | English | 1.11 MB | ||
![]() |
Short descriptionHighway D47, Nord Moravia, Czech Republic.
Date: 12/04/2012
05_saw_klimkovice_highway_tunnel.pdf
Download pdf
|
|||||
5 | Precast tubbing production for the tunnel in Gdansk, Poland | References Construction (Sika at Work) | English | 1.22 MB | ||
![]() |
Short descriptionConcrete Production: Sika® ViscoCrete®, Sika® Aer, Waterproofing: Sikadur®, Concrete Protection: Sika® TR
Date: 16/07/2015
SAW_Tunneling_Gdansk_Poland.pdf
Download pdf
|
|||||
6 | Road Tunnel Grouft, Luxemburg | References Construction (Sika at Work) | English | 1.76 MB | ||
![]() |
Short descriptionHeart of the New Highway Route du Nord.
Date: 12/04/2012
13_2008_saw_road_tunneling_grouft.pdf
Download pdf
|
|||||
7 | Tunnel Projects Worldwide | References Construction (Sika at Work) | English | 0.59 MB | ||
![]() |
Short descriptionSika Tunneling & Mining
Date: 12/04/2012
saw_tunneling_mining_02.pdf
Download pdf
|
|||||
8 | Tunnels | References Construction (Sika at Work) | English | 0.74 MB | ||
![]() |
Date: 12/04/2012
saw_tunnels_15_06.pdf
Download pdf
|
|||||
9 | Uetliberg Highway Tunnel | References Construction (Sika at Work) | English | 1.14 MB | ||
![]() |
Short descriptionBypass Zurich South, Switzerland.
Date: 12/04/2012
02_09_saw_uetliberg_road_tunnel.pdf
Download pdf
|
|||||
10 | ViscoCrete Technology for Site Batched Concrete | References Construction (Sika at Work) | English | 0.57 MB | ||
![]() |
Date: 12/04/2012
saw_sitebatch_concprod_05_06.pdf
Download pdf
|
|||||
11 | Waterproofing of Caisson Tokio, Japan | References Construction (Sika at Work) | English | 0.46 MB | ||
![]() |
Short descriptionTunnel projects of Shinagawa Central Ring Road are essential to reallocate the traffic jam in Tokyo etc. Most of tunnels are built of caisson placed underground and need to be waterproofed.
Date: 12/04/2012
10_11_saw_shinagawa_central_ring.pdf
Download pdf
|
|||||
12 | Waterproofing of Concrete Construction | References Construction (Sika at Work) | English | 0.84 MB | ||
![]() |
Short descriptionSika Injectoflex-System.
Date: 12/04/2012
saw_waterproofing_14_06.pdf
Download pdf
|
|||||
|