New York Metropolitan Transit Authority #7 Line, USA
yes
New York Metropolitan Transit Authority #7 Line, USA

In planning for more than 50 years, the 2nd Avenue subway line is now becoming a reality. Tunnels and stations are built.

Tokyo Metro Line 13, Japan
yes
Tokyo Metro Line 13, Japan

Tunnel projects of Tokyo Metro Line 13 are one of the biggest construction projects in Japan.

Rail: Railway Stations

Search results  11  in 89,18 ms
No Download/Name Doctype Lang Format Size
1 CAIRO METRO LINE 3 PHASE 2 STATIONS, CAIRO EGYPT References Construction (Sika at Work) English pdf 0,47 MB
CAIRO METRO LINE 3 PHASE 2 STATIONS, CAIRO EGYPT

Short description

REFURBISHMENT : Sika Lasqa®, Sika Tile Grout®

Date: 02/02/2016
saw_Cairo_metro_line-3_egypt.pdf
Download pdf

2 Corrosion- and Fire Protection References Construction (Sika at Work) English pdf 1,03 MB
Corrosion- and Fire Protection

Short description

Renovation of Fire Protection System in Vienna’s Rail Network
Station “Wien Mitte”, Austria .

Date: 12/04/2012
20_09_saw_fire_protection_wien.pdf
Download pdf

3 Gotthard Railway Base Tunnel References Construction (Sika at Work) English pdf 1,55 MB
Gotthard Railway Base Tunnel

Short description

Sections Bodio / Faido and Sedrun, Switzerland.

Date: 12/04/2012
01_09_saw_gotthard_base_tunnel.pdf
Download pdf

4 Metro Dubai References Construction (Sika at Work) English pdf 0,92 MB
Metro Dubai

Short description

The Largest Driverless Metro in the World with
Sika’s Concrete Technologies

Date: 12/04/2012
20_saw_metro_dubai_low.pdf
Download pdf

5 Milan Underground System References Construction (Sika at Work) English pdf 0,93 MB
Milan Underground System

Short description

Elongation M1 Metrofiera;
M 3 Dergano – Comasina, the new automatic M5, Milan, Italy

Date: 12/04/2012
07_09_saw_metro_milano.pdf
Download pdf

6 New York Metropolitan Transit Authority #7 Line References Construction (Sika at Work) English pdf 1,14 MB
New York Metropolitan Transit Authority #7 Line

Short description

In planning for more than 50 years, the 2nd Avenue subway line is now a becoming a reality. A number of different methods will be used to tunnel for 13.7 kilometers (9 mi) underneath Manhattan, which is densely populated.

Date: 12/04/2012
saw_NY_Metro_TransitAuthority_Low.pdf
Download pdf

7 Refurbishment of Shed Roofs References Construction (Sika at Work) English pdf 0,73 MB
Refurbishment of Shed Roofs

Date: 25/11/2014
No02.13_saw_Refurbishment of Shed Roofs_A3.pdf
Download pdf

8 The integrated transportation center in Poznan, Poland References Construction (Sika at Work) English pdf 1,03 MB
The integrated transportation center in Poznan, Poland

Short description

CONCRETE Production: Sika® ViscoCrete®, Sika® LPS, Sika® Rapid

Date: 16/07/2015
SAW_Integrated_Transportation_Center_Poznan_Poland.pdf
Download pdf

9 Tunnel Projects Worldwide References Construction (Sika at Work) English pdf 0,59 MB
Tunnel Projects Worldwide

Short description

Sika Tunneling & Mining

Date: 12/04/2012
saw_tunneling_mining_02.pdf
Download pdf

10 Waterproofing of Concrete Construction References Construction (Sika at Work) English pdf 0,84 MB
Waterproofing of Concrete Construction

Short description

Sika Injectoflex-System.

Date: 12/04/2012
saw_waterproofing_14_06.pdf
Download pdf

11 Waterproofing of Tunnels of Tokyo Metro, Japan References Construction (Sika at Work) English pdf 0,58 MB
Waterproofing of Tunnels of Tokyo Metro, Japan

Short description

Tunnel projects of Tokyo Metro Line 13 are one of the biggest construction projects in Japan. A new subway is extended. The tunnel is constructed by dig and cast method; waterproofing layer of 27’000 m2 is established prior to concrete walls.

Date: 12/04/2012
11_11_saw_tokyo_metro_line_13.pdf
Download pdf