Renewal of Uenohara Forestry Water Channel, Japan
Renewal of Uenohara Forestry Water Channel, Japan

Water channel for forestry purpose became degraded and must be maintained.

Hydropower Plant, Central Paso Los Quilos, Chile
Hydropower Plant, Central Paso Los Quilos, Chile

At the hydropower Plant in Chile a water discharge tank showed large cracks due to ground settlement.

Water: Waterways

Search results  in 97.85 ms
No Download/Name Doctype Lang Format Size
1 Balmoral Sea Wall, Mosman, Sydney, Australia References Construction (Sika at Work) English pdf 0.72 MB
Balmoral Sea Wall, Mosman, Sydney, Australia

Short description

CONCRETE REFURBISHMENT: Sika® Monotop®, SikaDur®, Sika® Gunite

Date: 22/06/2015
saw_Refurbishment_Balmoral Sea Wall_Australia_web.pdf
Download pdf

2 Renewal of Uenohara Forestry Water Channel, Japan References Construction (Sika at Work) English pdf 0.46 MB
Renewal of Uenohara Forestry Water Channel, Japan

Short description

Water channel for forestry purpose became degraded and must be maintained. It is essential that the renewal work is done without destroying and disturbing the environment. Water channel of 500 m2 in total is refurbished and renewed.

Date: 12/04/2012
12_11_saw_uenohara_forestry_water_channel.pdf
Download pdf

3 Waterproofing of a Flood Protection Wall at River Danube, Hainburg, Germany References Construction (Sika at Work) English pdf 0.45 MB
Waterproofing of a Flood Protection Wall at River Danube, Hainburg, Germany

Date: 09/08/2012
31_saw_Sikalastic-841ST_ProtectionWall_Hainburg_Germany.pdf
Download pdf

4 Waterproofing of an Erosion Protection Structure References Construction (Sika at Work) English pdf 0.28 MB
Waterproofing of an Erosion Protection Structure

Short description

Waterproofing of an Erosion Protection Structure at Richards Bay Habour, near Berth 208, South Africa

Date: 12/04/2012
No43_saw_Richards_Bay_Harbour_Berth_low.pdf
Download pdf