Waterproof Basement
30,000
Cubic Metres of Watertight Concrete
Ground Floor Slabs
15,000
Bags of Flowable Repair Mortar
Columns & Beams
5000
Bags of Repair Mortar

A visionary plan emerged to revitalise Battersea Power Station and its surroundings, creating a vibrant mixed-use destination. It was one of the largest and most ambitious urban redevelopment projects in Europe, aiming to foster a thriving neighbourhood for living, working, and socialising while preserving the power station's architectural heritage.

In order to achieve this modern masterpiece, ingenuity and innovation were combined with the world’s most advanced specialists and construction methods. To become the reborn icon of London, the basement structure had to be revolutionised – providing unwavering foundations for the entire complex to be redeveloped was the pivotal first step.

In order to achieve this, Sika worked closely with expert contractors to excavate the substructure and a waterproofed concrete basement was poured using 30,000 cubic metres of concrete.

We were very proud to be chosen as the key supplier for the Battersea Power Station project. Combining decade-long experience with world-class innovations, our solutions delivered the foundation for this amazing Icon of urban regeneration

Want to be part of building the modern world?

Sika's innovative products and solutions are positioned to thrive and succeed in all challenges facing our modern world.

We provide products and services across all industries in the construction markets. From concrete admixtures in the foundations through to facade finishes nearing the project completion.

Talk to us about your next project, and how we can build the modern world together.