2021
Birmingham

Sika weathertight protection for award winning offsite school project.

A technically advanced, high-performance, hybrid roofing membrane from global building product manufacturer Sika, provided the watertight finish for a new school which was built using innovative offsite construction techniques.

The newly-constructed King Edward VI Northfield School for Girls in Birmingham, which was designed by architect Atkins Global on behalf of client Acivico Group, replaces Turves Green Girls’ School. The original establishment was in a poor state of repair and following consultations with the local authority, it was agreed constructing a new school building represented a cost-effective alternative to refurbishment.

The new school includes contemporary classrooms, a dance studio, sports hall and a purpose-built library. The building’s airy feel is created by its wide corridors and stairways which are filled with natural light. This will help to inspire a calm and pleasant environment for staff and students.

To meet performance and programme goals for the building’s construction, a hybrid design was devised by offsite construction and modular specialists, Innovaré. Such innovation was recognised at the annual Offsite Awards, withInnovaré – in a joint submission with Sika – winning the ‘Best Use of Hybrid Technology’ category for its successful Design for Manufacture and Assembly (DfMA) delivery of the King Edward VI Northfield School construction project.

 

"We are proud that in collaboration with RLW Roofing, our products and expertise were used to successful effect in the delivery of this wonderful school, RLW’s skill and expertise were instrumental in delivering a technically robust solution." Simon Griffiths Head of Sales

Products Used

SikaBit® Pro-940

Project Participants

Innovaré

Sika UK

Atkins Global

RLW Roofing