Installation of earthing points
Refer to Sika® Method Statement: Mixing and Application of Flooring Systems.
Number of earthing connections per room: Minimum of 2 earthing connections. The optimum number of earthing connections depends on the local conditions and must be specified on drawings or other contract documentation.
ESD conductivity measurements
Recommended number of conductivity measurements is specified in the following table:
| Ready Applied Area | Number of Measurements |
| < 10 m² | 6 |
| ≥ 10 m² and < 100 m² | 10 to 20 |
| ≥ 100 m² and < 1000 m² | 50 |
| ≥ 1000 m² and < 5000 m² | 100 |
If the measurements yield values that are outside of the agreed specification, follow these steps:
- Carry out one additional measurement within a radius of approximately 30 cm around the original measuring point.
If the value of the new measurement meets the agreed specification, the original measurement can be disregarded. If the value of the new measurement does not meet the agreed specification, you may repeat the measurement described above, until the fulfilment of the requirements have been verified. If the requirements cannot be verified, contact Sika® Technical Services.
IMPORTANT
Temporary heating
If temporary heating is required, do not use gas, oil, paraffin or other fossil fuel heaters. These produce large quantities of both carbon dioxide and water vapour, which may adversely affect the finish.
a) For heating, use only electric powered warm air blower systems.
IMPORTANT
Protecting the material after application
After application, protect the System from damp, condensation and direct water contact for at least 24 hours.