Flooring Case Studies

Alan Howard Hair and Beauty, Manchester
Case Study PDF - 327 KB (en)
Alan Howard Hair and Beauty, Manchester
Sika pulled out all the stops when providing a robust and impressive flooring solution for a hair and beauty wholesaler in Greater Manchester. Alan Howard Hair and Beauty Supplies, in Stockport, required easy-to-maintain and aesthetically pleasing flooring for its 750m2 trade supply warehouse.
Alaraby TV Studio, London
Case Study PDF - 153 KB (en)
Alaraby TV Studio, London
This was an incredibly high-profile project which required close coordination of contractor, manufacturer and client to ensure a successful floor installation. The installation itself had to be of the highest specification to ensure the safe movement of cameras and other vital equipment around a TV studio. To achieve this, the client specified flooring which performed to British Standards in terms of flatness.
Car Engine Production Facility, Midlands
Case Study PDF - 338 KB (en)
Car Engine Production Facility, Midlands
FLOORING: Sikafloor®-2 Syntop, Sikafloor® Proseal CONCRETE PRODUCTION: Sikament®-700
Cardium Products, Halifax
Case Study PDF - 114 KB (en)
Cardium Products, Halifax
Sika provided a hygienic, resilient floor built to withstand the long-term rigours of an industrial, state-of-the-art food production plant.
Castle Hill School, Stockport
Case Study PDF - 397 KB (en)
Castle Hill School, Stockport
As part of a major refurbishment at Castle Hill School in Stockport, the 160 pupil high school required a high performance flooring solution that was not only robust enough to last, but soft enough underfoot to minimise impacts.
Cat's Pyjamas, Leeds
Case Study PDF - 125 KB (en)
Cat's Pyjamas, Leeds
Sikafloor® provided the urgent solution when a popular city centre restaurant required a smart, durable surface installed in a matter of hours to ensure the business opened on time.
Clifton Down Shopping Centre Multi-Storey Car Park, Bristol
Case Study PDF - 164 KB (en)
Clifton Down Shopping Centre Multi-Storey Car Park, Bristol
Sika’s watertight car park deck system ensured the deteriorating top two decks of a multi-storey car park have been restored and brought into use as a vital parking facility for a nearby shopping centre.
Costa Coffee, Basildon, Essex
Case Study PDF - 297 KB (en)
Costa Coffee, Basildon, Essex
The high-calibre building required a high-quality flooring to cover a 5,000m2 area. The client’s Whitbread, acting on behalf of Costa Coffee, requested a system which was durable, sustainable and offered a smooth, hi-gloss polyurethane finish as well as a 10-year lifecycle and thermal capabilities of up to 70 ̊C.
County Hall Car Park, Hertford
Case Study PDF - 268 KB (en)
County Hall Car Park, Hertford
Sika were chosen to supply a single source solution for concrete repair, corrosion management and a waterproof car park deck system to the existing staff multi-storey car park in Hertford.
Cromer Crab Company
Case Study PDF - 254 KB (en)
Cromer Crab Company
When it came to refurbishing a floor that was part of a busy and much needed food preparation area, specialist seafood producer the Cromer Crab Company needed a surface that was hard wearing, resistant and easily cleaned.Sikafloor®-20N PurCem
Distribution Centre
Case Study PDF - 849 KB (en)
Distribution Centre
Sika delivers complete flooring system at global retailer's distribution centre
Distribution Centre, Skelmersdale
Case Study PDF - 121 KB (en)
Distribution Centre, Skelmersdale
A highly-complex floor refurbishment has transformed a derelict warehouse into highly marketable business premises, thanks to global product supplier, Sika.
Earles Kitchen, Nottingham
Case Study PDF - 139 KB (en)
Earles Kitchen, Nottingham
This project required a flooring solution for a modern contemporary kitchen extension – the client wanted something sleek and seamless to complete the look and turned to Sika’s resin products as the answer.
Eastgate Multi Storey Car Park Basildon
Case Study PDF - 245 KB (en)
Eastgate Multi Storey Car Park Basildon
The car park was in need of major refurbishment. Continual exposure to chlorides from de-icing salts, carbon dioxide and water penetration, had caused the concrete to spall as the steel reinforcement within had corroded.
Loading...