Built Right. Sustained Longer.

Protect your new concrete assets from day one with Sika’s low-carbon, high performance repair and protection systems.

Sika is redefining how we approach defects in new concrete structures. Our sustainable new build repair solutions not only correct early-stage issues, they extend the life of your asset while reducing your environmental impact.

KEY BENEFITS:

✔ PAS 2080-aligned low-carbon formulations

✔ Durable systems built for early-stage defects

✔ Designed to protect, strengthen, and preserve from day one

Construction site of the Ourdomain new build apartments in Amsterdam, Netherlands

 

 

 

 

New build defects? Sika has the solution

Surface pinholing, shutter damage, honeycombing, cracking, and voids are common challenges in new concrete construction — but they don’t have to compromise quality. Explore our sustainable, high-performance new build concrete repair range, developed to tackle these issues head-on and deliver a durable, seamless finish from the start.

Sika MonoTop®
Sustainable Range
 

Low-carbon mortars engineered for high durability with reduced environmental impact. Perfect for addressing minor new build defects sustainably.

Sikagard®-5500   
 
                        
Sikagard®-5500 high crack-bridging concrete protection package pail packshot

Protective coating that adds longevity and resistance to your concrete assets.

 

 

SikaGrout®-800 
                                       
Sika Grout-800 Packshot

Heavy-duty, high-performance grout for precision anchoring and filling.

 

 

AnchorFix® Range 
 
Sika Anchorfix-2 Normal

Reliable chemical anchoring for structural components in new builds.

 

 

From Inspection to Protection: Repairing New Build Concrete

Concrete defects can occur at any stage of a structure’s life - even in new builds. Addressing these issues early is key to ensuring long-term performance and reducing costly future repairs. By focusing on sustainability, durability, and innovative solutions from the outset, structures can be protected and preserved for decades to come.

1. Inspection and Diagnosis
Thorough evaluation to identify defects and their root
causes.
2. Preparation
Cleaning and removal of damaged concrete to ensure proper bonding.
3. Repair and Protection
Use of advanced materials to fill cracks, replace damaged sections, and prevent future deterioration.
4. Finishing
Applying protective coatings to restore aesthetics and enhance durability.

New Build - Repair Guide

From surface preparation to curing.

The information provided in this section is for general guidance only and does not replace the need for detailed application instructions. All Sika products must be used in accordance with the relevant Product Data Sheets (PDS), Method Statements, and applicable regulations. Users are responsible for verifying product suitability and compliance. For tailored technical advice, please contact Sika Technical Services

DEFECT IDENTIFICATION & MARK-OUT

 

Surface Preparation: 

Mark defective concrete

 

Concrete Removal:

  • Using a high pressure water jet, 1,100bar (large area) 
  • OR with a hammer drill (medium area)
  • OR hammer and chisel (small patch repairs)

 

Remove tie wires, nails etc. 

Remove only defective concrete as instructured

Do not reduce structural integrity

Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

CUTTING DEPTHS

 

Extent of Concrete Removal:

  • Remove concrete minimum 15 mm behind main bars

 

Correct Substrate Preparation: 

  • Rough surface (2 mm minimum)
  • Cut sides more than 90" to avoid under cutting and maximum 135° to reduce debonding around edges
  • Substrate shall be sound with no loose material

 

Inform a supervisor immediately if there are any cracks in the substrate.

 

Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

CLEANING REINFORCEMENT

 

How to Clean Reinforcement:

Remove all

  • Tie wires
  • Mortar/concrete
  • Rust/scale
  • Other loose material

 

Removal Techniques:

1. Steel wire brush or hand/power tools

  • Technique applicable only in carbonated concrete and under environmental constraints where techniques 2 and 3 cannot be used.
  • Reinforcement uniformly cleaned

 

2. Abrasive blast cleaning techniques

  • Reinforcement uniformly cleaned
  • If chlorides are present reinforcementshould be cleaned with water afterwards

 

3. High pressure water jet ting (1100 bar min)

  • Reinforcement uniformly cleaned

 

Inform a supervisor immediately of any damaged reinforcement. 

 

Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

CORROSION APPLICATION

 

Application of Corrosion Protection:

  • Apply two 1 mm thick coats (total 2 mm minimum)

 

First coat must be hardened before it is ready for the second coat.

Prior to applying the repair mortar, the corrosion protection must be dry.

 

Sika Monotop repair mortar site application step by step illustration

 

BONDING PRIMER APPLICATION

 

Applying Bonding Primer (if specified): 

  • Wet the substrate
  • Wipe away excess water

 

Application Techniques:

  • For small patches brush firmly onto surface
Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

 

HAND PLACED CONCRETE REPAIR MORTAR APPLICATION

 

Application Techniques:

  • Press the repair mortar firmly into the repairarea using a trowel and/or hand
  • Apply second coat, when first coat is dry ( if application depth exceeds products maxium coat thickness)
  • Profile the surface and finish with a trowel
  • For best results, finish the surface with a PVC or wooden trowel, do not spray additional water over the surface.
Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

OVERHEAD CONCRETE REPAIR MORTAR APPLICATION

 

Application Technique:

  • Apply mortar tightly behind reinforcementuntil bars are covered
  • Press firmly to ensure pores in concretesubstrate are filled
  • From same end apply second coat in samedirection as first
  • Repeat coats until void is filled
  • Smooth surface using a wooden trowel
Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

LARGE SECTION MICRO CONCRETE APPLICATION

 

Surface Preparation 

  • Wet the substrate (if no bonding primer applied)
  • Wipe away excess water
    Small area: with sponge
    Large area: with air pressure

 

  • Fix shutter as required.
  • Mix and pour

 

 

pour application for new build

 

CONCRETE FAIRING COAT APPLICATION

 

Surface Preparation:

  • Wet and clean the surface with water (180 bar)

 

Smoothing or Levelling Mortar:

  • Apply vertically using toothed trowel
  • Apply with trowel approximate 45° to surface
  • When the first coat is hard, apply second coat
  • After product has set, smooth surface usinga wooden trowel

 

Use different size toothed trowel for required coat thickness

Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

CONCRETE REPAIR CURING

 

Curing Protection:

Protect application from

  • Rain
  • Sun
  • Frost
  • Wind

* Apply as soon as possible after application to avoid surfacecracking / crazing

 

Curing Methods: 

  • Plastic sheeting
  • Fabric and water
  • Other membranes

 

If no subsequent coating is to be applied on the surface an approved curing agent (e.g.Sika® Antisol®) could be used.

 

 

 

Sika Monotop repair mortar site application step by step illustration

Sika Monotop repair mortar site application step by step illustration

 

STORAGE AND APPLICATION CONDITIONS

 

Storage:

  • Dry and cool conditions
  • Undamaged original packaging

 

Application:

Protect area from

  • Direct sunlight
  • Wind
  • Rain
  • Frost

 

Temperature:

Check acceptable limits

  • Ambient temperature
  • Substrate temperature
 

Do not mix and apply the product in direct sunlight.

Storage warehouse shelves and floor

Storage warehouse shelves and floor and worker with palette

Protect Your Concrete – and Your Image

Sikagard®-850 Clear – Invisible Protection Against Graffiti & Posters

New concrete doesn't just need to be strong — it needs to stay clean, professional, and protected. Sikagard®-850 Clear is a high-performance, non-sacrificial anti-graffiti and anti-fly poster coating that shields surfaces from vandalism while preserving aesthetics. Whether it’s a wall, façade, or site hoarding, one simple application gives lasting, low-maintenance protection.

KEY ADVANTAGES: 

 

Ready to use - no dilution with solvent necessary at the job site.

Permanent - graffiti can be typically removed more than 50 times without damaging the protection, or requiring a refresher coat, when using non-aggressive cleaning techniques. 

Poster prevention – fly poster does not bond onto protected substrate or can be easily removed, even after many cleaning cycles.

Semi-matt aspect. Clear aspect when using the fair-faced concrete build-up.

No chemical agents required for cleaning.

With Sika, you can build with confidence from day one. Our sustainable repair and protection systems not only safeguard new concrete assets but also extend their service life while reducing environmental impact.

Get in touch with our team to explore the right solution for your project.

Get expert guidance on new build concrete repair – send us your enquiry today!