SikaScreed®-20 EBB
Epoxy bonding bridge for Sikascreed floor screeding systems
SikaScreed®-20 EBB 2-part, epoxy based,moisture tolerant bonding bridge for SikaScreed® floor screeding systems.
- Easy to mix and apply
- Suitable for dry and damp concrete surfaces
- High substrate adhesion strenth
- Hardens without shrinkage
Usage
A bonding bridge for: SikaScreed® product rangeAdvantages
- Easy to mix and apply
- Suitable for dry and damp concrete surfaces
- High substrate adhesion strenth
- Hardens without shrinkage
Packaging
Pre batched units (A + B): 15 kg containers
Colour
Part A = White Part B = Dark Grey Mixed A+B = Concrete Grey
Product Details
APPROVALS / STANDARDS
Structural bonding products for use bonding of mortars or concrete according to EN 1504-4, declaration of performance 41536303 and provided with CE marking.
Chemical Base
Epoxy resin and special fillers
Shelf Life
24 months from date of production
Storage Conditions
Product must be stored in original, unopened and undamaged sealed packaging in dry conditions at temperatures between +5 °C and +30 °C.
Always refer to packaging.
Density
~1.4 kg/litre (+23 °C)
Tensile Adhesion Strength
> 1.5 N/mm2 or a failure in the substrate. Adhesion will generally be dependent on surface preparation.
Application
Layer Thickness
~ 1.0 mm max.
Ambient Air Temperature
+10 °C min. / +30 °C max.
Dew Point
Beware of condensation.
The substrate and uncured product must be at least +3 °C above dew point to reduce the risk of condensation.
Substrate Temperature
+10 °C min. / +30 °C max.
Substrate Moisture Content
Substrate must be dry or matt damp (no standing water).
Pot Life
(acc. to EN ISO 9514) |
Temperature | Potlife (200 g) |
+10 °C | ~ 145 minutes |
+20 °C | ~ 55 minutes |
+30 °C | ~ 35 minutes |
The pot-life begins when the resin and hardener are mixed. It is shorter at high temperatures and longer at low temperatures. The greater the quantity mixed, the shorter the pot-life. To obtain longer workability at high temperatures, the mixed SikaScreed®-20 EBB may be divided into smaller quantities. Another method is to cool down parts A+B before mixing them (not below +5 °C).
Waiting Time / Overcoating
Maximum waiting time for wet-in-wet application on SikaScreed®-20 EBB
Temperature | Waiting time |
+10 °C | 5 hours |
+20 °C | 2 hours |
+30 °C | 1 hour |
If the maximum waiting time is exceeded then product should be removed before any further SikaScreed®-20 EBB appllications and the substrate prepared appropriately.
Consumption
For substrate roughness up to 1.0 mm and normal absorbency ~ 0.6 - 1.0 kg/m².
These figures are theoretical and do not allow for any additional material due to surface porosity, surface profile, variations in level or wastage
etc. For higher substrate roughness and/or stronger absorbency the consumption must be calculated using preliminary site trials.
MIXING
Part A : part B = 2 : 1 by weight or volume.Prior to mixing all parts, mix part A (resin) using a low speed single
paddle electric stirrer (300 - 400 rpm) until a uniform
colour has been achieved. Add part B (hardener) to
part A and mix part A + B continuously for 3.0 minutes
until a uniformly coloured mix has been achieved. To
ensure thorough mixing pour materials into a clean
container and mix again for at least 1.0 minute to
achieve a smooth consistent mix. Over mixing must be
avoided to minimise air entrainment. During the final
mixing stage, scrape down the sides and bottom of the
mixing container with a flat or straight edge trowel at
least once to ensure complete mixing. Mix full units
only. Mixing time for A+B = 4.0 minutes.
APPLICATION
Prior to application, confirm substrate moisture content, relative air humidity and dew point.
Levelling. Avoid excess thicknesses of the SikaScreed®-20 EBB in local areas by prefilling as required, any surface voids with the SikaScreed HardTop mortar system.
Bonding bridge. Pour mixed SikaScreed®-20 EBB onto prepared substrate and apply evenly to the required thickness using a suitable stiff bristle brush or broom and work material well into the substrate. Alternatively for dry substrates, apply by roller or spray application. Ensure all areas of the substrate are fully covered. Apply SikaScreed® floor screeding systems on top of SikaScreed®-20 EBB ‘wet’ on ‘wet’.When applying SikaScreed® floor screeding systems on top of SikaScreed®-20 EBB bonding bridge. As a guide it is recommended to keep application area to a maximum of 4 m² in addition to recommended waiting / overcoating times.
CLEANING OF TOOLS
Clean all tools and application equipment with Sika® Colma Cleaner immediately after use. Hardened / cured material can only be removed mechanically.